Writing an AV RFP a real integrator can price

10 November 2026Charles TrinhRemote
Writing an AV RFP a real integrator can price — cover card
Procurement · Writing an AV RFP a real integrator can price
Writing an AV RFP a real integrator can price

Outcome, room type, constraint

State what the room must do, how many of each room type exist, and the constraints that actually bind — schedule, occupied-building work, union labour, network policy, security screening. A per-device shopping list invites substitution arguments and hides the engineering you are buying.

Make bids comparable

Require a separated price for equipment, labour, commissioning, training and first-year service, plus the drawing set and a responsibility matrix. With those five, bids compare. Without them, the lowest number is simply the one with the most assumptions left out.

AV RFPAV procurementintegrator selectiondesign-buildcontract vehiclesevaluation
TRINH — Charles Trinh, technology architect
TRINH

Charles Trinh

Fractional CTO/CIO and Technology Architect — Healthcare Data, Identity & Regulated Infrastructure · Las Vegas, NV

Las Vegas, Nevada · US citizen · Fractional and project engagements

(702) 559-3489 Email Charles Trinh